James CardFreelance Writer

September 24, 2009

Korea’s Four Rivers Project: Economic Boost or Boondoggle?

Yale Environment 360
September 21, 2009

The natural landscape of South Korea has been largely re-engineered, with nearly every river damned or forced into concrete channels. Now the government is reviving plans for a mammoth water project that would dredge and develop hundreds more miles of waterways and put added stress on the country's remaining wildlife.

The Korean peninsula was once called geum-su-gang-san, “a land of embroidered rivers and mountains.” Before South Korea industrialized in the postwar years, the rivers were wild-running freestone streams barreling down the mountains and turning into sandy shallow rivers edged by wetlands as they reached the sea. In her 1898 book Korea and Her Neighbors, 19th-century travel writer Isabella Bird described the upper Namhan River as “where pure emerald water laps gently upon crags festooned with roses and honeysuckle, or in fairy bays on pebbly beaches and white sand.”

That world is long gone now, as the Namhan and nearly every other South Korean river has been dammed, forced into concrete channels, or otherwise re-engineered by successive governments that have funneled billions of dollars to the powerful construction industry to fund countless public works projects designed to tame the country’s rivers. Today, besides a handful of creeks deep in the mountains or protected in national parks, only one major river, the Dong, exists in a natural meandering and un-dammed state.

Read the rest at Yale Environment 360.

« The Fish are Biting, and the Room Is Hopping | Writings | Where These Fish Are Jumpin’, Arrows Are Aimed »